OIL DOCK NO. 6 CONSTRUCTION, OIL DOCK NO. 3 FENDER SYSTEM REPLACEMENT, AND FACILITY ENHANCEMENTS, AND MAINTENANCE DREDGING

Location: Brownsville, TX

Oil Dock No. 6 construction included an approximate 1,300-foot-long bulkhead and approximately 215,000 cubic yards of dredging to a depth of 42’ MLT, as well as 56,600 CY maintenance dredging for existing docks. Major project items involved furnishing and installing steel sheet piles, precast-prestresses concrete piles and panels, steel pipe piles, six multi-pile mooring structures, fenders, four multi-pile breasting structures, and shoreline stabilization using articulating concrete block revetment mats. Major yard items included site clearing & excavation, backfilling, crushed stone base course, hot mix asphaltic concrete pavement, site lighting, electrical, and potable water main extension.


Oil Dock No. 3 tasks included replacing two existing breasting structure fenders with new spools, fenders, and chains. The facility enhancements work constructed a pile-supported barge fendering system and two breasting structures.

Project Tasks:

  • Mooring Structures
  • Steel Sheet Pipe Pile
  • Breasting Structures
  • Precast concrete piles
  • Shore Stabilization
  • Excavation and Backfilling
  • CIP Concrete
  • Dredging
  • Site Improvements
  • Steel Sheet Piles w/ Tiebacks
  • Fender System